in Design/Build, Public Safety 9 Oct Fire station expertise helps meet the public safety needs of a fast-growing residential area. Project Type: Fire Station Client: Deerfield Township Construction Cost: $4,500,000 Square feet: 20,000 SF KZF served as Criteria A/E for the design and development of a new, 20,000 SF fire station and headquarters for Deerfield Township Fire Department. The $4.5M project was delivered through the design-build process. Additionally, KZF provided site surveying and site engineering in preparation for the final design and construction package, as well as supplemental stormwater studies to address issues that arose during criteria evaluation phase.
More Projects Tri-State Wholesale Building Supplies Design/Build, Industrial/Warehouse Shillito’s West Redevelopment Design/Build, Renovations, Retail, Workplaces Gate of Heaven Cemetery Columbarium Cultural The Beechmont Plan Planning