Reclamation of riverfront land provides room for outdoor stage and event lawn drawing crowds of 30,000.
Project Type
Park
Client
City of Ashland
Construction Cost
$10,200,000
Length
0.5 miles
KZF Design provided master planning and final engineering services for the redevelopment of Ashland’s downtown waterfront. The plan embodies Ashland’s motto of “A proud past. A bright future.” by blending contemporary riverfront design with historic buildings and archeological sites. Unique water walls on the city-side of the flood wall will be commissioned by local artists to provide a unique alternative to painted murals. KZF then assisted the city in implementing the plan and providing services, including design aesthetics and various work session meetings with the city commissioners and engineering staff.