Goshen Township Fire Station

Meeting the challenges of a limited budget and constrained site.

Project Type
Fire Station

Client
Goshen Township, OH

Construction Cost
$1,500,000

Square Feet
3,100 SF

KZF Design provided full architecture, interior design, mechanical, electrical, civil and structural engineering services for the design and construction of a new, single story columbarium. The $1.5M, 3,100 SF building is the first indoor columbarium for the Archdiocese, providing a range of remembrance options for families and reflecting the Catholic Church’s desire for the prayerful reverence of cremated remains.