The 70-year-old west-side Cincinnati connector receives a desperately-needed overhaul.
Project Type
Highway
Client
City of Cincinnati
Construction Cost
$55,000,000
Length
1/2-mile
KZF prepared construction documents for the replacement of the existing US 50 bridge and an award-winning gateway design. KZF also designed the storm sewer system drainage and the street lighting system including aesthetics for the entire new roadway. A 25′ future allowance for bicycle/pedestrian use is included in the proposed typical section on the south side of the project.