Improving traffic flow, reducing congestion and expanding pedestrian access on Winton Road.
Project Type
Roadway
Client
Hamilton County Engineer
Construction Cost
$4,830,000
Linear Feet
2,900 LF
KZF Design provided civil and traffic engineering for the widening of Winton Road from Fleming Road to Sarbrook Drive. This provided left-turn lanes with full-depth replacement of existing pavement, replacement of curbs and storm sewer system, installation of 7’ wide sidewalk along both sides of Winton Road, with lighting, signal and landscaping improvements. Preliminary engineering for the project investigated a number of alternatives, ultimately recommending widening on both sides of the road.